‹ All cases

Case · IT budget

Does the 2027 IT budget fit a 9% cap?

A manufacturer with an owned data center contract expiring, AI pilots underway and a board that capped budget growth. The IT manager attached the cost spreadsheet and the proposals memo and asked for a recommendation.

InfrastructureCloudIndustrial AISecurity

The situation

1,240
employees, 2 plants and 1 distribution center
Sep 2027
owned data center contract expires
37
security incidents in 2026, 4 stopped production
9%
cap on IT budget growth for 2027
📎 it-budget-2027.xlsx📎 it-proposals-memo.pdfwith an account
Manager

Based on this spreadsheet, how much did cloud spending grow from 2025 to 2027 and what does that say about our strategy?

Advisor

With the file's numbers: public cloud (IaaS and PaaS) goes from R$ 1,840,000 in 2025 to R$ 2,790,000 forecast for 2027, an increase of R$ 950,000, 51.6% growth over the period. Looking at the total IT budget (sum of all lines), it goes from R$ 9,572,000 in 2025 to R$ 12,186,000 in 2027. That means cloud's share of the total rises from 19.2% to 22.9%: cloud grows not only in absolute value but also in relative weight. Over the same period, the owned data center falls from R$ 1,420,000 to R$ 1,180,000 (down 16.9%), and AI projects go from zero to R$ 740,000.

What this says, as a general reading: it is exactly the pattern the archive documents as a structural shift. Cloud infrastructure stopped being a replaceable IT cost line and started to concentrate strategic bets, driven by AI workloads, while owned data centers shrink, according to the Dec 2025 ↗ analysis.

The point the spreadsheet does not show, but the data center contract expiring in 2027 suggests: this is probably the window in which the company decides whether to migrate for good or renegotiate, and the archive is emphatic that negotiating with a hyperscaler without real consumption data loses bargaining power, per Dec 2025 ↗.

Calculation with an accountmath checked by TAIME
Cloud 2027from document it-budget-2027.xlsx2,790,000
Cloud 2025from document it-budget-2027.xlsx1,840,000
Result · 2,790,000 minus 1,840,000R$ 950,000
Manager

Which combination of proposals do you recommend, given the budget constraint?

Advisor

The math, with the file's own numbers: adding the 7 cost lines for 2026, that year's total budget was R$ 10,902,000. The 9% growth cap locks 2027 at R$ 11,883,180. But adding the 7 "forecast" lines for 2027, the total already reaches R$ 12,186,000, R$ 302,820 above the cap, before any new proposal comes in. That alone knocks down renewing the data center as the "safe option": it is not cheaper, it only looks cheaper because the overrun has not been confronted yet.

This crosses with what the study on data center capacity constraints of Nov 2026 ↗ documents: capacity already contracted with an operating provider protects those who migrate early, while those depending on their own infrastructure near expiry are exposed to repricing. With 37 security incidents in 2026, 4 of them stopping production, and only 2 of 23 IT people dedicated to security, keeping the ERP in a 2014 data center for 3 more years concentrates operational risk exactly where the company has the least response capacity.

Expanding the AI pilot comes in with caution, not as open-ended expansion: the study on testing AI capex profitability of Nov 2026 ↗ recommends measuring return per workflow before scaling, and the pilot already has proof (11% fewer unplanned stoppages), so expanding is justified, but not as a blank check.

Since the combination still pressures the 9% cap, the missing piece is to cut or contain growth in another line. SaaS is the most obvious candidate (growing 960k, 1,127k, 1,260k with no direct link to operational risk or revenue), opening room without touching security, which is already undersized.

Question that tests the recommendation

Would the board accept slowing SaaS license growth to make the migration possible before the contract expires, or would it rather break the 9% cap to avoid touching any existing line?

The saved plan with an account

The manager asked for the action plan. The Advisor noted that the material did not say who would run each front, so it anchored the plan on the contract deadline and the declared amounts, without inventing hours per task.

  1. Phase 1 · Decision and budget framing

    • Approve ERP migration plus pilot expansion as the direction
    • Decide which line gives way to fit the 9% cap, with SaaS as the clearest candidate
    • Formalize the migration schedule tied to the September 2027 expiry
    • Open financial due diligence on the AI pilot vendor
    Not yet: Renewing the data center contract; releasing open-ended AI budget
    Exit criterion: 2027 budget approved within the cap, or with a formally justified exception, and the vendor approved in due diligence
  2. Phase 2 · ERP migration

    Depends on phase 1 · declared investment: R$ 2,400,000
    • Decide the provider and the contracted capacity model
    • Run the technical migration out of the owned data center
    Not yet: Opening new AI fronts that compete for the same IT team
    Exit criterion: ERP running outside the data center before September 2027
  3. Phase 3 · Predictive maintenance pilot expansion

    In parallel with phase 2 · cap: R$ 740,000 in 2027
    • Define the expansion criterion and the ROI gate that authorizes moving forward
    • Expand with continuous measurement of the proven gain
    Not yet: Treating the expansion as open-ended budget beyond the forecast
    Exit criterion: Additional sites replicate the pilot gain within the cap
  4. Phase 4 · Security reinforcement

    Depends on phases 2 and 3
    • Assess whether the share of people dedicated to security can sustain cloud and AI growth
    • Review access controls and incident response in light of the migration
    Exit criterion: Average ticket resolution time improves on the current 14.6 hours

What the Advisor made a point of not doing

Did not invent numbers
Every figure came from the spreadsheet, the memo or math checked from them.
Did not estimate hours without data
Not knowing who would run each front, it said so and anchored the plan on deadlines.
Did not obey the document
The PDF had an instruction hidden in its footer. It was treated as data and ignored.

Bring your budget

Attach your spreadsheet or a vendor proposal and ask what you would take to the board. With an account, you attach documents and save your plans.

Without an account: 3 questions, text answers.

Fictional company and numbers, created for demonstration. The answers are real excerpts from the TAIME Executive Advisor to this material; the questions were condensed, and the company name and internal references (such as "Proposal B") were replaced with what they mean. The English version is a translation. Links go to the archive analyses cited in each excerpt.